A season is late because of the longest item in it, not the average one. Build the calendar from the coats and the custom cloth, then fit everything else around them.

MANLOR Development Team · 6 October 2026 · 7 min read

Work backwards from the warehouse

The date that matters is arrival, not the factory ex-date. Subtract shipping, then bulk production, then the sealed pre-production sample, then fit, then the proto, then fabric. The fabric step is short when cloth is in the market and long when a mill is weaving or dyeing it.

  • In-store or launch date
  • Shipping time to your warehouse
  • Which styles need developed fabric
  • Which styles are private label on existing blocks

AW and SS are not the same calendar

Autumn/winter is usually gated by coatings and knit yarns. Spring/summer is gated by linen and dyeing, and by the wash tests those cloths need before a size set. A brand that uses one calendar for both seasons will be early on shirts and late on coats.

What usually sits on the critical path
SeasonStarts the clockCan start later
Autumn / WinterWool coatings, custom knits, tailored outerwearShirts and jersey in stock cloth
Spring / SummerLinen qualities and their wash tests, custom coloursPrivate-label styles on resolved blocks

A planning pattern, not a promise. Current season windows are on the collections page and are confirmed per project.

One schedule, written

Put the stages in one schedule the designer and the factory both use: brief, fabric approval, proto, fit, size set, sealed sample, bulk, inspection, ship. A stage without an owner and a date is the stage that slips. Our order-stage table is the list of start points; your project schedule puts dates on them.

Frequently asked questions

How do I plan a collection calendar for AW and SS seasons?

Start from the warehouse date and work backwards. Put custom fabric and the heaviest garments on the critical path — coatings for autumn, linen and wash tests for spring — and let simpler styles in available cloth start later. Confirm every date in a written schedule once the fabric route is known.

How early is early enough for coats?

About nine to twelve months before an autumn/winter delivery, because the coating is developed or dyed to order. The current windows we are working to are on the collections page.

Can new styles be added mid-season?

Yes, if they use cloth and blocks already in development. A new coating or a new knit programme is a new critical path, not a line on the existing one.

Start a Related Project

From the Journal

Start a related project.

Put this guide into practice — share your brief and our development team will reply with next steps.

What are you looking to develop?

Start a Related Project