Autumn / Winter 2027
Open for concept & fabric development- Concept & fabric
- Oct – Dec 2026
- Proto & fit
- Jan – Feb 2027
- Pre-production & bulk
- Mar – May 2027
- Delivery
- Jun – Jul 2027
Every collection runs the same sequence — brief, fabric, sample, fit, sealed sample, bulk, inspection, shipping. Work back from the day goods must reach your warehouse to find the day development has to start.
Choose when goods must arrive, how the fabric is sourced, how many fit rounds to allow and how they ship.
Start development by1 Feb 202726 weeks from brief to warehouse
| Stage | Weeks | Start by | Finish by | Starts when |
|---|---|---|---|---|
| Brief review & quotation | 1 | 1 Feb 2027 | 8 Feb 2027 | A complete brief is received |
| Fabric & trims | 6 | 8 Feb 2027 | 22 Mar 2027 | Fabric direction is agreed |
| First sample | 2 | 22 Mar 2027 | 5 Apr 2027 | Brief, fabric direction and sample fee are confirmed |
| Fit rounds | 4 | 5 Apr 2027 | 3 May 2027 | Your written fit comments are received |
| Pre-production sample | 2 | 3 May 2027 | 17 May 2027 | Fit is approved and bulk fabric and trims are in house |
| Bulk production | 5 | 17 May 2027 | 21 Jun 2027 | The last of: PPS approval, bulk fabric passed, deposit received |
| Final inspection & packing | 1 | 21 Jun 2027 | 28 Jun 2027 | Production complete, at least 80% packed |
| Shipping to your warehouse | 5 | 28 Jun 2027 | 2 Aug 2027 | Inspection passed, balance settled as agreed |
Planning allowances, not a quotation. Sampling is typically 9–12 days and bulk 25–35 days from its start point. Your written schedule replaces every figure here — what starts each stage.
Indicative windows for in-store dates of January–March (SS) and July–September (AW), confirmed per project.
A season is late because of its slowest step.
| Driver | What happens | How to protect the date |
|---|---|---|
| Custom fabric | Weaving, knitting or dyeing to order adds weeks before the right cloth exists. | Agree the fabric route first; cut the proto in the closest available cloth while bulk fabric is developed. |
| Fit rounds | Each round needs written comments, a pattern correction and a new sample. | Send one consolidated set of comments per round, with measurements and photographs. |
| Late comments | The next sample starts when written comments arrive, not when the sample does. | Agree a reply window for each round in the schedule. |
| Trims and labels | Woven labels, branded hardware and custom buttons have their own lead times. | Approve label artwork and trim cards with the fabric, not after fit. |
| Laboratory tests | Many programmes need wash, colourfastness or composition results before bulk. | Test bulk fabric as soon as it arrives — materials testing. |
| Chinese New Year | Mills and factories close; output typically stops for two to four weeks. | Seal the pre-production sample before the holiday, or start bulk after it. The planner adds this buffer. |
| National Day, 1–7 October | A week-long public holiday that pauses mills and logistics. | Keep fabric deliveries and approvals out of that week. |
| Shipping mode | Sea freight to the US or Europe takes weeks; air takes days at a higher cost per piece. | Decide the mode before the ex-factory date is fixed. |
For a new premium style, plan roughly four to six months from a complete brief to goods in your warehouse. Sampling typically takes 9–12 days per sample and bulk typically 25–35 days from its start point; the rest of the calendar is fabric, fit approvals, inspection and shipping.
Start from the coats and any custom cloth: these usually begin nine to twelve months before an autumn delivery, while shirts and styles in available fabric can start later.
Yes, by removing work rather than squeezing it: available fabric instead of custom development, private label on resolved blocks, fewer fit rounds, or air freight. A date that skips the sealed pre-production sample is not a plan.
No. They are planning allowances. Each date for your order is fixed in the written development schedule once the fabric route and style count are known.
A season is late because of the longest item in it, not the average one. Build the calendar from the coats and the custom cloth, then fit everything else around them.
Read the guideGuide · 7 min readSampling is the stage most brands underestimate. Knowing the sample types and what drives each one lets you set a realistic launch calendar.
Read the guideGuide · 8 min readA manufacturer's MOQ is rarely arbitrary. It is the quantity at which fabric minimums, line set-up and sampling cost make a style viable. Understand the drivers and you can plan around them.
Read the guideFrom concept to sealed sample and controlled bulk. We reply within 24 hours — tech packs welcome, not required.