Start from the delivery date
Outerwear has the longest fabric lead time in a collection. For an autumn/winter delivery, concept and fabric need to start about nine to twelve months earlier. A coat begun when the rest of the collection is already in fit will be waiting on cloth.
- Delivery date and sales window
- Target retail price
- Quantity per colour, even if it is a range
- Reference coat, sketch or tech pack
Choose the cloth before the pattern is finished
The pattern consumes the fabric, and the fabric changes the pattern. A double-faced wool that will be worn unlined needs hand-finished edges and no lining allowance. A melton overcoat needs interlining, lining and a shoulder that can carry the weight. Changing cloth after fit approval usually means a new fit round.
| Cloth | What it asks of the coat | Watch for |
|---|---|---|
| Double-faced wool | Unlined, edges separated, turned and slip-stitched by hand | Edge bulk, and a mill minimum per colour |
| Melton or wool blend | Lined body, interlining, shoulder and hem balance | Weight pulling the front or the hem |
| Custom coating | Weight, blend and colour developed with a mill | Lab dips and a longer lead time than stock cloth |
Fit the hang, not only the measurements
A coat is accepted or rejected by how it hangs: shoulder, front edge, vent and hem. Measure it against the spec, then look at it on a form and on a person standing and walking. Check matching on checks at the front, pockets, sleeves and centre back before the size set.
- Balance of shoulder, front and hem
- Sleeve pitch and vent
- Lining not pulling the shell
- Check match specified in the marker
What has to be true before bulk
Bulk cutting should wait until three things are done: the pre-production sample in bulk fabric and trims is approved and sealed, the bulk cloth and trims have been checked, and the quantity is confirmed against the mill minimum. Inspection of the bulk is then against that sealed sample.
Frequently asked questions
How do I develop a wool coat with a Chinese manufacturer?
Start nine to twelve months before delivery. Agree the coating first, fit the coat for balance as well as measurements, and do not cut bulk until a pre-production sample in the bulk cloth is sealed. Confirm the mill minimum per colour in writing before you commit the range.
Do women's and men's coats share a pattern?
No. They can share a factory and a finishing standard, but the blocks differ in shoulder, chest and sleeve pitch. A men's coat resized from a women's block will not hang.
Why do wool coat quantities run higher?
Coating mills set a minimum per colour, a coat uses more metres than any other garment in the collection, and the construction takes longer to set up. The arithmetic is in our guide to how fashion MOQ works.