Defect classes
Inspectors classify each defect by its effect on the customer.
- Critical: unsafe or illegal — for example a needle fragment or missing mandatory label. Usually zero tolerance.
- Major: likely to cause a return — open seam, wrong measurement, visible stain, shade difference.
- Minor: unlikely to cause a return — loose thread, small finishing irregularity.
Sample sizes and accept/reject numbers
Under ISO 2859-1, General Inspection Level II, single sampling, normal inspection, the lot size determines the sample size. The lot is accepted if defects found are at or below the accept number (Ac) and rejected at or above the reject number (Re).
| Lot size | Sample size | AQL 1.5 | AQL 2.5 | AQL 4.0 |
|---|---|---|---|---|
| 151–280 | 32 | 1 / 2 | 2 / 3 | 3 / 4 |
| 281–500 | 50 | 2 / 3 | 3 / 4 | 5 / 6 |
| 501–1,200 | 80 | 3 / 4 | 5 / 6 | 7 / 8 |
| 1,201–3,200 | 125 | 5 / 6 | 7 / 8 | 10 / 11 |
| 3,201–10,000 | 200 | 7 / 8 | 10 / 11 | 14 / 15 |
Accept and reject numbers apply separately to each defect class.
What a final inspection covers
- Quantity and packing against the packing list
- Workmanship against the sealed PP sample
- Measurements on a sub-sample against the graded spec
- Shade consistency within and between cartons
- Labels, hangtags and carton marks
- Functional checks: zips, buttons, snaps
Why AQL alone is not enough
AQL is a statistical acceptance test at the end of production. If a lot fails, the options are rework, delay or rejection — all costly. Premium quality comes from preventing defects earlier: fabric approval before cutting, a sealed PP sample, and inline measurement during sewing.
Frequently asked questions
What AQL should a premium fashion brand use?
A common premium standard is zero critical defects, AQL 1.5 or 2.5 for major defects and AQL 4.0 for minor defects, at General Inspection Level II.
Who should carry out the final inspection?
The manufacturer's QC team inspects every order; many brands add their own QC or a third-party inspection company for final inspection. MANLOR welcomes both.
What happens if a lot fails AQL?
The lot is typically sorted and reworked, then re-inspected. Your contract should state how failed inspections, re-inspection costs and delivery delays are handled.